Tuesday, 31 January 2017

Barn Development - 25

The floor being laid down the hall way.
I moved some of my sewing things into my new sewing room and this was an attempt to keep the cats and dust out!
More flooring.
The en suite floor tiles going down.
The walk in shower taking shape.  Kevin is an excellent tiler.



The main bathroom, or my sanctuary! walls being primed for tiles.

The tiles over the bath completed and the radiator hung.
Meanwhile we are starting to move furniture into the master bedroom.

Space yeh!!!





We bought a whole load to wardrobes from Ikea so that we could put them up straight away and begin to get sorted.  If they fall to bits some time later, then we can think again.

No comments:

Post a Comment