Finally the builders start the difficult task of adding plaster board abd plaster.










 The velux windows in the kitchen ceiling had to be built up as the roof pitch was not steep enough.  These also had to be plasterboarded.


The small guest bedroom.

The plasterers did an excellent job as some of the roof spaces were very small.  The oak beams were wrapped in plastic to protect them from the water and plaster.
The kitchen ceiling was the first complete area plastered.

The hall before and after plastering.  The room at the far end is my new work room.

The floor incelation was also added in this photo.