Tuesday, 12 April 2016

Barn Development 7




The new septic tank arrives on the back of a lorry. The builders have dug and laid a new waste pipe down in front of the barn and connected it to our existing waste pipe.  This was joined to our original septic tank that now belongs to the main house.  The pipe will run down in front of the barn, across and under the new floor and eventually to the new septic tank located in the back garden.




 Bijan borrowed the builders digger with permission and dug out a wild life pond while it was on site.


There were more waste pipes to be connected and soon the garden was full of deep trenches and a very large hole!  We were quite surprised at the size of the septic tank.




David climbs down into the hole to direct the digger.




The septic tank is lowered into the hole with the digger.


A small area of hard standing is laid for the new oil tank which is currently in a temporary position in front of the barn.


The top of the septic tank is left above the ground.

This is what is inside the septic tank. The disks turn slowly helping to break down the waste. We are one more step closer to becoming independent!