Monday, 21 March 2016

Barn Renovation 5



In no time the walls started going up. Some areas were built in breeze blocks that will later be covered with cladding.



A large old tree was removed and made into a soak away and next to it a new base for the oil tank, which is in a temporary position around the front of the barn.



No comments:

Post a Comment