Insulation has been laid down on all of the new floors and then the pipes for the underfloor heating.
All of the pipes end in a cupboard
which will be the control area eventually.
The area where the walk in shower is to be situated has been separated with wood.
Little metal spiders mark the level that the scree has to be poured to.