Tuesday 31 January 2017

Barn Development - 26

We chose a Neptune painted kitchen from Ben Heath in Newbury.  We wanted a very simple layout with minimal wall units.

The day the kitchen units arrived  was very exciting. It didnt take long before they had been arranged along the back wall.


A plynth was added to support an upstand at the back of the work surface.
The island was then bolted together.

The extractor fan was assembled and put up.  It was quite a  complicated proceedure because of the zinc roof.

Pegs were added to support a shelf either side of the extractor fan.  Meanwhile the lighting was going up as well.

The island work surface is oak and was made especially.

The sink area was completed and a few days later the granite was templated and fitted.
Once the shelf was added with lights the area was complete.
We chose granite along the back wall also and once that was down the hob was inserted.






The completed kitchen.

No comments:

Post a Comment