Friday 16 December 2016

Barn Developemnt 19

Insulation has been laid down on all of the new floors  and then the pipes for the underfloor heating.





All of the pipes end in a cupboard
which will be the control area eventually.
The area where the walk in shower is  to be situated has been separated with wood.


Little metal spiders mark the level that  the scree has to be poured to.