Wednesday 16 March 2016

Barn Renovation 4

It doesn't take long for the builders to start laying the footings and brickwork.  Once they had reached a certain height, they broke up a lot of the old rubble to lay under the

floors.  I was very impressed with how ordered and tidy they were.


The metal frame for the bi fold doors arrived and was put in place so they could build up around it.






A ditch was dug all around the edge for the soil pipes and the pipes laid in place. large areas of the garden were also dug away for the new septic tank and the pipes leading to it.


The old log store looks very different and is taking shape.  This is going to be my new work room!


No comments:

Post a Comment