Monday 14 March 2016

Barn Renovation 3

The old buildings have come down and all of the rubble taken away or piled up for later use. Extra earth has been removed to allow for new foundations.










The view from the cottage kitchen.















Ditches have been dug for the wall foundations. The blue pipe is our water pipe.



A crane arrives with the concrete and a man directs the flow from the pipe that goes all the way over the cottage.








No comments:

Post a Comment